FID Dashboard

Backlog, throughput, and turnaround across the inspection pipeline
Loading backlog…

Where the queue is stuck

Tasks per stage, with how long they have been sitting there

Intake vs completion

Tasks raised against tasks approved, weekly

Workload by engineer & status

Sorted by open work — the most loaded engineer is first

Assigned vs inspected by engineer

How much of the quantity assigned to each engineer has been inspected — lower progress is redder

Progress
Engineer Assigned Qty Inspected Qty Inspected %

QC user productivity

Inspected quantity and turnaround per QC user — bar colour shows the 1-day SLA

SLA ≥ 90% SLA 75–89.9% SLA < 75% Bar = inspected qty · label = avg TAT and SLA %

Turnaround KRI

Where the time actually goes, per role

—

—

Hours
Actor Avg Hours

Work Orders

All assigned inspection tasks

WO No Department Product Size Qty Status Assigned To Assigned By Assigned Date Completion Date

Thank you for creating with Aira|
2025 © Aira

v1.1.0